Second stage completed. Ditch dug out through to the main drain which will ensure constant running water throughout the year. The sides have been landscaped and it been decided to lower the front of the 17th tee to improve the aesthetic look of the hole. Sides of the ditch will hopefully be turfed next week. Soil around the edge of the gabions will be removed once green levels are re instated.

Further work will continue including re instating the path, boarding the ditch, installing timber bridge, further turfing/seeding areas and re construct and drain green side bunker. Further updates to follow.